When you plan a demolition project, there is more than simply hiring a contractor and establishing a start date. Prior to the arrival of equipment at the site, you need to ensure that the current building is safe for demolition. An essential part of making the building safe is to disconnect all of the major service lines (i.e., electrical, gas, water and telephone/telecommunication) from the building.

The process of terminating/disconnecting service is sometimes referred to as service abolition/disconnection. Delaying this process will lead to delays in demolishing and delay the complete construction timeline. Some planning prior to this time will assist in keeping your project on target.

Why Must Services Be Disconnected Before Demolition?

The presence of old service connections can pose significant hazards when tearing down a building. These include live electrical wires, active gas lines, and/or active water lines which could result in injury, leakage, or damage to property.

The service providers will require time to assess the property, coordinate the shut-off of services, and finish all necessary tasks prior to the demolition process. It is recommended that these actions are scheduled as far ahead of the scheduled demolition as possible.

If you are planning for knockdown rebuild in Sydney, arranging for service abolishment prior to the completion of council approvals and demolition permit applications will help you avoid having to wait for the abolishment process to occur.

Which Services Need to Be Disconnected?

Each property has its own unique needs. But, there are certain common elements to many demolition projects.

Electricity

To have a permanent disconnection, contact either your electricity retailer or network provider. Your electric meter will also likely require removal. It is important to remember that turning off the main power supply does not make a building safe for demolition.

Gas

Gas supply must be turned off and the lines must be capped, either by the utility company that provides gas service to your home or by a licensed plumber/contractor who is certified to work on gas systems. By turning off the gas, you can avoid having gas escape while you dig up the ground or tear down a building.

Water and Sewerage

Water supplies should be turned off or capped. Depending on what is needed for the demolition process and site conditions, sewer lines will also require some type of work.

Internet and Telecommunications

Call your Internet and phone companies. Find out how to remove your current services and what to do with overhead or underground wires.

How Long Does Service Abolishment Take?

The duration of the process will vary from one property to another. Some properties have their service disconnected in just a few days, whereas others require several weeks to complete this task.

Delays may occur because of:

  • Limited appointments with service providers.
  • Complex underground connections.
  • Missing property documents.
  • Additional safety inspections.
  • Unclear ownership of service infrastructure.

The safest method of doing this would be to contact the providers at the same time you begin to plan your demolition.

Who Should Coordinate the Process?

The homeowner will need to find out what work they are going to be doing themselves and what will be taken care of by the demolition company/builder. It’s recommended to make copies of all of your confirmation letters for utilities being disconnected and any certificates of safety.

When comparing new home and land packages in Sydney, please note that an established property requires a completely different type of preparation than a vacant lot. All existing utilities must be evaluated prior to the start of the demolition process.

Keep Your Demolition Schedule on Track

In addition to being a relatively simple administrative task, ignoring service disconnections can delay an entire project. Incorporate these requirements into your pre-demolition checklist and provide additional time for scheduled service provider appointments.

The professionals that will be managing your knockdown rebuild Sydney will be able to assist with coordination of the necessary steps prior to beginning demolition work.

As well as being able to understand the service connections of your new home or land package in Sydney, this knowledge can be used to determine the cost of building on the property in the future and what will be required to prepare the site for the building process.

A properly prepared location for a new residence will make the process of moving into your first residence from your old one much easier and safer.

Previous articleSlat Profiles, Motors and Controls Explained: A Trade Buyer’s Guide to Roller Shutter Components
Next articleRoller Shutters on Sliding Doors: Guide Rail Clearance, Box Size and Fitting Challenges